BioBox Katerini

The BioBox unit is under construction and is expected to be operational in the end of December 2018.
The realization of the BioBox unit takes place at……. .
The method of operation is the dry anaerobic thermophilic digestion which will process 11,8 tons of chicken waste on daily basis, producing annually 565.000 m3 of biogas.
WasteEnergy SA in cooperation with the Dutch company AllOptimal BV has undertaken the to apply all necessary local engagements in respect to this BioBox units requirements of maintenance and the daily operation on the AllOpitimal Total Care service level.

SRMK-3a

SPECIFICS:

  • Plant location: Katerini /Greece
  • Process: Dry anaerobic thermophilic digestion
  • Capacity: 4.100 tons of chicken waste /year
  • Digester: Plug flow 2 x 90 m3
  • Liquid fertiliser: Waste Water Treatment
  • CHP: 1 x 180 kW
  • Start-up: December 2017
  • H WasteEnergy: Manages, maintains and operates the BioBox

WasteEnergy και BioBox concept

  • Optimal organic waste management
  • Active CO2-reducer certification
  • Renewable energy for the organization
  • Full Operational & Service contract
  • Guaranteed lifetime and performance


Realization by:

top